The overhead waterwash for a delayed coker main fractionator system is the same as for an FCCU main fractionator overhead. The volume of water required is calculated based on what is needed to condense the water present with an added excess; typically, this is 25%. In some cases, the site, instead, bases the washwater requirement on the feed to the tower.
Read more